Curtain walling shows up on commercial specs constantly — but it's often treated as a catch-all term rather than a system with real technical demands. If you're a developer or main contractor weighing it up for a project, here's what matters.
What curtain walling is
Curtain walling is a non-structural aluminium facade system fixed to a building's structural frame. The steel work carries the building's load, not the curtain walling. This is what makes it possible to create the large, continuous glazed elevations typical of modern commercial buildings, without the facade needing to bear weight itself.
It's typically built from vertical mullions and horizontal transoms, infilled with glazed or opaque panels, and can be specified as either unitised (pre-fabricated off-site in large sections and craned into place) or stick-built (assembled piece by piece on site). Each with different implications for programme, cost, and quality control.

Why it gets specified
- Design flexibility. Curtain walling allows for large, uninterrupted areas of glass, which is difficult to achieve with other facade systems — a major driver for offices, retail, and residential schemes where daylight and visual impact matter.
- Thermal and weather performance. When correctly detailed, modern curtain walling systems achieve strong U-values and airtightness, comparable to other high-performance facade types.
- Programme efficiency. Unitised systems can significantly speed up the facade installation phase compared with traditional window-by-window glazing, which matters when programme is tight.
The real decision
The question for a developer or main contractor usually isn't "curtain walling or not" in the abstract, it's whether curtain walling is the right system for this building's scale, budget, and performance targets, and whether it's being specified and installed by a team that understands the detailing that makes the difference between a facade that performs for decades and one that becomes a maintenance liability.

Where we come in
We work with developers and main contractors from early design stage through to installation — providing technical input on system selection, thermal performance modelling, and buildability, so issues are caught on paper rather than on site.